Simultaneous Vehicle and Crew Scheduling with Trip Shifting
From MaRDI portal
Publication:5391966
DOI10.1007/978-3-540-77903-2_72zbMath1209.90040OpenAlexW1591810811MaRDI QIDQ5391966
Publication date: 7 April 2011
Published in: Operations Research Proceedings (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-540-77903-2_72
Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35) Theory of organizations, manpower planning in operations research (90B70)
Cites Work
This page was built for publication: Simultaneous Vehicle and Crew Scheduling with Trip Shifting