Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups

From MaRDI portal
Publication:539458

DOI10.1007/s10951-010-0197-6zbMath1213.90124OpenAlexW2084886727MaRDI QIDQ539458

António Aroso Menezes, Bernardo Almada-Lobo, Alistair Richard Clark

Publication date: 30 May 2011

Published in: Journal of Scheduling (Search for Journal in Brave)

Full work available at URL: http://eprints.uwe.ac.uk/11483/1/2nd_Revision_CLSP_with_NTS_and_SC_highlighted.pdf




Related Items (14)

Multiple-stage multiple-machine capacitated lot-sizing and scheduling with sequence-dependent setup: a case study in the wheel industrySimultaneous lotsizing and scheduling problems: a classification and review of modelsModeling lotsizing and scheduling problems with sequence dependent setupsNew integer optimization models and an approximate dynamic programming algorithm for the lot-sizing and scheduling problem with sequence-dependent setupsAgile two-stage lot-sizing and scheduling problem with reliability, customer satisfaction and behaviour under uncertainty: a hybrid metaheuristic algorithmA Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problemA genetic algorithm/mathematical programming approach to solve a two-level soft drink production problemOn production planning and scheduling in food processing industry:modelling non-triangular setups andproduct decayHybrid stochastic and robust optimization model for lot-sizing and scheduling problems under uncertaintiesEconomic lot sizing problem with tank schedulingHybrid matheuristics to solve the integrated lot sizing and scheduling problem on parallel machines with sequence-dependent and non-triangular setupA capacitated lot-sizing model with sequence-dependent setups, parallel machines and bi-part injection mouldingClassifying and modeling setups and cleanings in lot sizing and schedulingPricing, relaxing and fixing under lot sizing and scheduling


Uses Software


Cites Work


This page was built for publication: Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups