Multi-inspection time optimisation for a cracked component based on a updating reliability approach
DOI10.1080/17797179.2013.820899zbMath1284.90016OpenAlexW1531005087MaRDI QIDQ5407316
No author found.
Publication date: 7 April 2014
Published in: European Journal of Computational Mechanics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/17797179.2013.820899
fatigue crack growthoptimisationfirst-order reliability methodresponse surfaceinspection schedulingupdating reliability
Deterministic scheduling theory in operations research (90B35) Reliability, availability, maintenance, inspection in operations research (90B25) Fracture and damage (74R99)
Related Items (1)
This page was built for publication: Multi-inspection time optimisation for a cracked component based on a updating reliability approach