TWO-MACHINE FLOW SHOP SCHEDULING WITH INDIVIDUAL OPERATION'S REJECTION
From MaRDI portal
Publication:5411726
DOI10.1142/S021759591450002XzbMath1302.90079OpenAlexW2041010530MaRDI QIDQ5411726
Publication date: 25 April 2014
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s021759591450002x
Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35)
Related Items (1)
Cites Work
- Two-machine flow shop scheduling problem with an outsourcing option
- Online scheduling with rejection and withdrawal
- Parallel-machine scheduling with deteriorating jobs and rejection
- Preemptive and non-preemptive on-line algorithms for scheduling with rejection on two uniform machines
- The unbounded parallel batch machine scheduling with release dates and rejection to minimize makespan
- Scheduling linear deteriorating jobs with rejection on a single machine
- Bounded single-machine parallel-batch scheduling with release dates and rejection
- Single machine scheduling with release dates and rejection
- Preemptive scheduling with rejection
- Two-machine flow-shop scheduling with rejection
- On-line scheduling of unit time jobs with rejection: Minimizing the total completion time
- Two-stage production scheduling with an outsourcing option
- Faster algorithms for the shortest path problem
- Multiprocessor Scheduling with Rejection
- Preemptive multiprocessor scheduling with rejection
This page was built for publication: TWO-MACHINE FLOW SHOP SCHEDULING WITH INDIVIDUAL OPERATION'S REJECTION