Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan
From MaRDI portal
Publication:541691
DOI10.1016/j.ejor.2010.11.021zbMath1213.90121OpenAlexW2003007295MaRDI QIDQ541691
Publication date: 7 June 2011
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2010.11.021
Related Items (27)
Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan ⋮ A branch-and-price algorithm for scheduling of deteriorating jobs and flexible periodic maintenance on a single machine ⋮ Batch scheduling with deteriorating jobs to minimize the total completion time ⋮ Single-machine scheduling with deteriorating jobs and aging effects under an optional maintenance activity consideration ⋮ Single-machine serial-batching scheduling with a machine availability constraint, position-dependent processing time, and time-dependent set-up time ⋮ Parallel-batching scheduling of deteriorating jobs with non-identical sizes and rejection on a single machine ⋮ Parallel-batch scheduling with deterioration and rejection on a single machine ⋮ A Production Plan Considering Parallel Machines and Deteriorating Effects: Minimizing the Makespan in the Section of Steel Box Girder Processing ⋮ Competitive two-agent scheduling with deteriorating jobs on a single parallel-batching machine ⋮ Robust parallel-batching scheduling with fuzzy deteriorating processing time and variable delivery time in smart manufacturing ⋮ Parallel-batch scheduling with two models of deterioration to minimize the makespan ⋮ A hybrid DBH-VNS for high-end equipment production scheduling with machine failures and preventive maintenance activities ⋮ Online scheduling with linear deteriorating jobs to minimize the total weighted completion time ⋮ Serial-batching scheduling with time-dependent setup time and effects of deterioration and learning on a single-machine ⋮ Scheduling deteriorating jobs on a single serial-batching machine with multiple job types and sequence-dependent setup times ⋮ A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan ⋮ Scheduling of deteriorating jobs with release dates to minimize the maximum lateness ⋮ Single machine serial-batching scheduling with independent setup time and deteriorating job processing times ⋮ Scheduling algorithm for flow shop with two batch-processing machines and arbitrary job sizes ⋮ Parallel-machine group scheduling with inclusive processing set restrictions, outsourcing option and serial-batching under the effect of step-deterioration ⋮ Complexity of scheduling with proportional deterioration and release dates ⋮ Two-agent scheduling with deteriorating jobs on a single parallel-batching machine: refining computational complexity ⋮ A note on the algorithm LPT-FF for a flowshop scheduling with two batch-processing machines ⋮ A review of four decades of time-dependent scheduling: main results, new topics, and open problems ⋮ Deteriorating jobs scheduling on a single machine with release dates, rejection and a fixed non-availability interval ⋮ MAKESPAN MINIMIZATION ON THREE-MACHINE FLOW SHOP WITH DETERIORATING JOBS ⋮ SCHEDULING POSITION-BASED DETERIORATING JOBS WITH MULTIPLE RATE-MODIFYING ACTIVITIES AND PAST-SEQUENCE-DEPENDENT DELIVERY TIMES
Cites Work
- Unnamed Item
- Parallel-machine scheduling of simple linear deteriorating jobs
- Scheduling deteriorating jobs subject to job or machine availability constraints
- Time-dependent scheduling
- Scheduling linear deteriorating jobs with rejection on a single machine
- ``Product partition and related problems of scheduling and systems reliability: computational complexity and approximation
- Single machine parallel-batch scheduling with deteriorating jobs
- Scheduling linear deteriorating jobs to minimize makespan with an availability constraint on a single machine
- A note on the optimal sequence position for a rate-modifying activity under simple linear deterioration
- Equivalent time-dependent scheduling problems
- Resource level minimization in the discrete-continuous scheduling
- Scheduling a batching machine
- Scheduling jobs under simple linear deterioration
- A concise survey of scheduling with time-dependent processing times
- Approximation algorithms in batch processing
- Scheduling one batch processor subject to job release dates
- Minimizing makespan with release times on identical parallel batching machines
- Single machine earliness-tardiness scheduling with resource-dependent release dates
- Minimizing makespan in batch machine scheduling
- Parallel machine scheduling with time dependent processing times
- Scheduling with batching: A review
- Complexity and approximability of scheduling resumable proportionally deteriorating jobs
- Parallel-machine scheduling with simple linear deterioration to minimize total completion time
- Scheduling linear deteriorating jobs with an availability constraint on a single machine
- Scheduling with time dependent processing times: Review and extensions
- Parametric problem in scheduling theory
- Algorithms for Scheduling Independent Tasks
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Minimizing makespan on a single batch processing machine with dynamic job arrivals
- Scheduling Groups of Jobs on a Single Machine
- Multi-Machine Scheduling With Linear Deterioration
- Minimizing maximum lateness under linear deterioration
This page was built for publication: Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan