Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan

From MaRDI portal
Publication:541691

DOI10.1016/j.ejor.2010.11.021zbMath1213.90121OpenAlexW2003007295MaRDI QIDQ541691

Yong-Cai Geng, Sumit K. Garg

Publication date: 7 June 2011

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2010.11.021




Related Items (27)

Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespanA branch-and-price algorithm for scheduling of deteriorating jobs and flexible periodic maintenance on a single machineBatch scheduling with deteriorating jobs to minimize the total completion timeSingle-machine scheduling with deteriorating jobs and aging effects under an optional maintenance activity considerationSingle-machine serial-batching scheduling with a machine availability constraint, position-dependent processing time, and time-dependent set-up timeParallel-batching scheduling of deteriorating jobs with non-identical sizes and rejection on a single machineParallel-batch scheduling with deterioration and rejection on a single machineA Production Plan Considering Parallel Machines and Deteriorating Effects: Minimizing the Makespan in the Section of Steel Box Girder ProcessingCompetitive two-agent scheduling with deteriorating jobs on a single parallel-batching machineRobust parallel-batching scheduling with fuzzy deteriorating processing time and variable delivery time in smart manufacturingParallel-batch scheduling with two models of deterioration to minimize the makespanA hybrid DBH-VNS for high-end equipment production scheduling with machine failures and preventive maintenance activitiesOnline scheduling with linear deteriorating jobs to minimize the total weighted completion timeSerial-batching scheduling with time-dependent setup time and effects of deterioration and learning on a single-machineScheduling deteriorating jobs on a single serial-batching machine with multiple job types and sequence-dependent setup timesA further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespanScheduling of deteriorating jobs with release dates to minimize the maximum latenessSingle machine serial-batching scheduling with independent setup time and deteriorating job processing timesScheduling algorithm for flow shop with two batch-processing machines and arbitrary job sizesParallel-machine group scheduling with inclusive processing set restrictions, outsourcing option and serial-batching under the effect of step-deteriorationComplexity of scheduling with proportional deterioration and release datesTwo-agent scheduling with deteriorating jobs on a single parallel-batching machine: refining computational complexityA note on the algorithm LPT-FF for a flowshop scheduling with two batch-processing machinesA review of four decades of time-dependent scheduling: main results, new topics, and open problemsDeteriorating jobs scheduling on a single machine with release dates, rejection and a fixed non-availability intervalMAKESPAN MINIMIZATION ON THREE-MACHINE FLOW SHOP WITH DETERIORATING JOBSSCHEDULING POSITION-BASED DETERIORATING JOBS WITH MULTIPLE RATE-MODIFYING ACTIVITIES AND PAST-SEQUENCE-DEPENDENT DELIVERY TIMES



Cites Work


This page was built for publication: Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan