Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size
From MaRDI portal
Publication:541698
DOI10.1016/j.ejor.2010.09.031zbMath1213.90167OpenAlexW2109011313MaRDI QIDQ541698
Publication date: 7 June 2011
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://engagedscholarship.csuohio.edu/cgi/viewcontent.cgi?article=1051&context=bus_facpub
Related Items
Capacity optimization and competition with cyclical and lead-time-dependent demands, Dynamic facility layout problem based on open queuing network theory
Cites Work
- Unnamed Item
- Manufacturing lead-time rules: customer retention versus tardiness costs
- Effective on-line algorithms for reliable due date quotation and large-scale scheduling
- Incorporating manufacturing lead times in joint production-marketing models: A review and some future directions
- Survey of scheduling research involving due date determination decisions
- Comparison of iterative improvement techniques for schedule optimization
- Integration of continuous caster and hot strip mill planning for steel production
- A mathematical programming model for scheduling steelmaking-continuous casting production
- Near-Optimal Dynamic Lead-Time Quotation and Scheduling Under Convex-Concave Customer Delay Costs
- Dynamic Pricing and Lead-Time Quotation for a Multiclass Make-to-Order Queue
- Reliable Due-Date Setting in a Capacitated MTO System with Two Customer Classes
- The Batch Loading and Scheduling Problem
- Production Planning with Flexible Product Specifications: An Application to Specialty Steel Manufacturing
- Optimal Leadtime Differentiation via Diffusion Approximations
- Steel-making process scheduling using Lagrangian relaxation
- Quoting Customer Lead Times
- A review of planning and scheduling systems and methods for integrated steel production