Replacement problems for a cold standby repairable system
From MaRDI portal
Publication:5426651
DOI10.1080/00207720500404516zbMath1126.90324OpenAlexW2034770574MaRDI QIDQ5426651
No author found.
Publication date: 13 November 2007
Published in: International Journal of Systems Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207720500404516
Reliability, availability, maintenance, inspection in operations research (90B25) Applications of renewal theory (reliability, demand theory, etc.) (60K10) Renewal theory (60K05)
Related Items
Optimizing replacement policy for a cold-standby system with waiting repair times ⋮ An optimal replacement policy for a multistate degenerative simple system ⋮ A bivariate optimal replacement policy for a cold standby repairable system with preventive repair ⋮ An optimal replacement policy for a two-component series system assuming geometric process repair ⋮ An optimal replacement policy for repairable cold standby system with priority in use ⋮ Availability optimisation of repairable system with preventive maintenance policy ⋮ An optimal repair-replacement policy for a cold standby system with use priority ⋮ A bivariate mixed policy for a simple repairable system based on preventive repair and failure repair ⋮ A bivariate optimal replacement policy for a cold standby repairable system with repair priority ⋮ Optimal replacement period of a two-unit system with failure rate interaction and external shocks ⋮ Two different general monotone process models for a deteriorating system and its optimisation ⋮ Discrete time cold standby repairable system: Combinatorial analysis ⋮ A geometric process repair model for a two-component system with shock damage interaction ⋮ A geometric process repair model with inspections and its optimisation
Cites Work
- Geometric processes and replacement problem
- Imperfect repair
- Optimal replacement policy for a deteriorating production system with preventive maintenance
- Optimum Preventive Maintenance Policies
- Optimal strategies for some repair replacement models
- A note on the optimal replacement problem
- A bivariate optimal replacement policy for a repairable system
- A shock model with two-type failures and optimal replacement policy
- Analysis of a two-component series system with a geometric process model