On the relocation problem with a second working crew for resource recycling
From MaRDI portal
Publication:5426652
DOI10.1080/10611860500411100zbMath1126.90343OpenAlexW2083007324MaRDI QIDQ5426652
Bertrand M. T. Lin, Hsiao-Lan Huang
Publication date: 13 November 2007
Published in: International Journal of Systems Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/10611860500411100
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (1)
Cites Work
- Scheduling subject to resource constraints: Classification and complexity
- A fast feasibility test for relocation problems
- Generating the best \(K\) sequences in relocation problems
- Polynomial algorithms for single machine scheduling problems with financial constraints
- Minimizing the weighted number of tardy jobs and maximum tardiness in relocation problem with due date constraints
- Optimal two- and three-stage production schedules with setup times included
- Relocation problems are hard
- Some results of the relocation problems with processing times and deadlines
- Relocation problems of maximizing new capacities under a common due date
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
This page was built for publication: On the relocation problem with a second working crew for resource recycling