Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
MaRDI portal item
Discussion
View source
View history
Purge
English
Log in

Minimizing makespan for two parallel machines with job limit on each availability interval

From MaRDI portal
Publication:5428993
Jump to:navigation, search

DOI10.1057/PALGRAVE.JORS.2602209zbMath1178.90156OpenAlexW2009115040MaRDI QIDQ5428993

No author found.

Publication date: 29 November 2007

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/palgrave.jors.2602209


zbMATH Keywords

schedulingparallel machinesmakespanbranch and bound methodavailability constraint


Mathematics Subject Classification ID

Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35)


Related Items (3)

Minimizing total completion time on a single machine with a flexible maintenance activity ⋮ A three-stage optimization algorithm for the stochastic parallel machine scheduling problem with adjustable production rates ⋮ Production, maintenance and resource scheduling: a review







This page was built for publication: Minimizing makespan for two parallel machines with job limit on each availability interval

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:5428993&oldid=20181547"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
This page was last edited on 9 February 2024, at 02:42.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki