Asset replacement for an urban railway using a modified two-cycle replacement model
From MaRDI portal
Publication:5429825
DOI10.1057/PALGRAVE.JORS.2602288zbMath1278.90236OpenAlexW2062037484MaRDI QIDQ5429825
No author found.
Publication date: 4 December 2007
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2602288
Reliability, availability, maintenance, inspection in operations research (90B25) Deterministic network models in operations research (90B10) Case-oriented studies in operations research (90B90)
Related Items (1)
This page was built for publication: Asset replacement for an urban railway using a modified two-cycle replacement model