Fabrication scheduling on a single machine to minimize the weighted sum of product completion time
From MaRDI portal
Publication:5436246
DOI10.1007/S11741-007-0204-0zbMath1174.90501OpenAlexW2050713248MaRDI QIDQ5436246
Publication date: 14 January 2008
Published in: Journal of Shanghai University (English Edition) (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11741-007-0204-0
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Combinatorial optimization (90C27)
Cites Work
This page was built for publication: Fabrication scheduling on a single machine to minimize the weighted sum of product completion time