Joint Monitoring of the Mean and Variance of Combined Control Charts with Estimated Parameters
From MaRDI portal
Publication:5436427
DOI10.1080/03610910701540052zbMath1126.62118OpenAlexW2095502374MaRDI QIDQ5436427
M. E. Calzada, Stephen M. Scariano
Publication date: 16 January 2008
Published in: Communications in Statistics - Simulation and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03610910701540052
Related Items (2)
The computation of average run length and average time to signal: an overview ⋮ The Exact Run Length Distribution and Design of the Shewhart Chart with Estimated Parameters Based on Median Run Length
Cites Work
This page was built for publication: Joint Monitoring of the Mean and Variance of Combined Control Charts with Estimated Parameters