Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Integrated capacity, demand, and production planning with subcontracting and overtime options - MaRDI portal

Integrated capacity, demand, and production planning with subcontracting and overtime options

From MaRDI portal
Publication:5436963

DOI10.1002/nav.20219zbMath1278.90133OpenAlexW2074636748MaRDI QIDQ5436963

Joseph Geunes, H. Edwin Romeijn, Yasemin Merzifonluoğlu

Publication date: 18 January 2008

Published in: Naval Research Logistics (NRL) (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1002/nav.20219




Related Items (11)




Cites Work




This page was built for publication: Integrated capacity, demand, and production planning with subcontracting and overtime options