Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Modeling and analysis of a mixed‐model assembly line with stochastic operation times

From MaRDI portal
Publication:5438268
Jump to:navigation, search

DOI10.1002/nav.20241zbMath1162.90345OpenAlexW1977537839MaRDI QIDQ5438268

Jianyong Liu, Shigenori Kotani, Katsuhisa Ohno, Xiao-Bo Zhao

Publication date: 23 January 2008

Published in: Naval Research Logistics (NRL) (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1002/nav.20241


zbMATH Keywords

algorithmMarkov processmixed-model assembly lineoverloadstochastic operation time


Mathematics Subject Classification ID

Transportation, logistics and supply chain management (90B06) Markov and semi-Markov decision processes (90C40)


Related Items

Second order conic approximation for disassembly line design with joint probabilistic constraints ⋮ Robust balancing of mixed model assembly line ⋮ Stochastic mixed-model assembly line sequencing problem: mathematical modeling and Q-learning based simulated annealing hyper-heuristics



Cites Work

  • Unnamed Item
Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:5438268&oldid=20201928"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 9 February 2024, at 04:19.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki