Maximizing project cash availability
From MaRDI portal
Publication:5438525
DOI10.1002/nav.20141zbMath1151.90435OpenAlexW2063492388MaRDI QIDQ5438525
George L. Vairaktarakis, Joseph G. Szmerekovsky
Publication date: 23 January 2008
Published in: Naval Research Logistics (NRL) (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.20141
Programming involving graphs or networks (90C35) Deterministic scheduling theory in operations research (90B35)
Related Items (2)
Project scheduling under the threat of catastrophic disruption ⋮ An integer programming formulation for the project scheduling problem with irregular time-cost tradeoffs
Cites Work
This page was built for publication: Maximizing project cash availability