A multi‐objective customer orders assignment and resource leveling in make‐to‐order manufacturing
From MaRDI portal
Publication:5438563
DOI10.1111/j.1475-3995.2007.00609.xzbMath1146.90394OpenAlexW2007755855MaRDI QIDQ5438563
Publication date: 24 January 2008
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1111/j.1475-3995.2007.00609.x
Related Items (2)
Integrated time–cost tradeoff and resources leveling problems with allowed activity splitting ⋮ Monolithic versus hierarchical approach to integrated scheduling in a supply chain
Cites Work
- Unnamed Item
- A taxonomy of flexible flow line scheduling procedures
- A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing
- Coordinated production scheduling for make-to-order manufacturing
- Hierarchical production planning in a make-to-order company: a case study
- Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
- A review of exact solution methods for the non-preemptive multiprocessor flowshop problem
- Resource levelling for projects with schedule-dependent time windows
- Integer programming approach to production scheduling for make-to-order manufacturing
- Optimal versus heuristic scheduling of surface mount technology lines
- Multi-objective master production scheduling in make-to-order manufacturing
- Hierarchical approach to production scheduling in make-to-order assembly
This page was built for publication: A multi‐objective customer orders assignment and resource leveling in make‐to‐order manufacturing