Failure models and throughput rate of transfer lines
From MaRDI portal
Publication:5438652
DOI10.1080/00207540600677716zbMath1128.90314OpenAlexW1999805034MaRDI QIDQ5438652
Xiaolan Xie, I. Mourani, Sophie Hennequin
Publication date: 24 January 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540600677716
Related Items (1)
Cites Work
- Unnamed Item
- On using continuous flow lines to model discrete production lines
- Analysis of departure times in discrete and continuous tandem production lines
- Derivative estimation for buffer capacity of continuous transfer lines subject to operation-dependent failures
- Approximate analysis of transfer lines with unreliable machines and finite buffers
- Stochastic modelling of an integrated pulp and paper factory with intermediate storage
- Optimal control of production rate in a failure prone manufacturing system
- Structural properties of optimal production controllers in failure-prone manufacturing systems
- Production control of a pull system with production and demand uncertainty
- Evaluation and optimization of two-stage continuous transfer lines subject to time-dependent failures
This page was built for publication: Failure models and throughput rate of transfer lines