Determination of batch size at a bottleneck machine in manufacturing systems
From MaRDI portal
Publication:5444487
DOI10.1080/00207540600675793zbMath1128.90398OpenAlexW2052334044MaRDI QIDQ5444487
Shie-Gheun Koh, Pyung-Hoi Koo, Robert L. Bulfin
Publication date: 25 February 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540600675793
Related Items (3)
Bi-level multi-objective mathematical model for job-shop scheduling: the application of Theory of Constraints ⋮ Simultaneous determination of lot size and production rate at capacity-constrained multiple-product systems ⋮ Rounding heuristics for multiple product dynamic lot-sizing in the presence of queueing behavior
Cites Work
- Multi-item batching heuristics for minimization of queueing delays
- An exploration of models that minimize leadtime through batching of arrived orders
- Analysis of expected queueing delays for decision making in production planning
- Expected time in system analysis of a single-machine multi-item processing center.
- Lot Sizes, Lead Times and In-Process Inventories
- The Shifting Bottleneck Procedure for Job Shop Scheduling
This page was built for publication: Determination of batch size at a bottleneck machine in manufacturing systems