Disassembly scheduling: literature review and future research directions
From MaRDI portal
Publication:5444546
DOI10.1080/00207540701440097zbMath1128.90396OpenAlexW2030684718MaRDI QIDQ5444546
No author found.
Publication date: 25 February 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540701440097
Related Items (11)
Disassembly EOQ models with price-sensitive demands ⋮ Capacitated disassembly scheduling with random demand ⋮ Job-shop production scheduling with reverse flows ⋮ Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times ⋮ Integrating disassembly line balancing in the planning of a reverse logistics network from the perspective of a third party provider ⋮ Integrated disassembly and reprocessing lot-sizing for multi-level structured products in remanufacturing systems ⋮ Towards circular economy in production planning: challenges and opportunities ⋮ Dynamic lot sizing for multiple products with a new joint replenishment model ⋮ An Outer Approximation Algorithm for Capacitated Disassembly Scheduling Problem with Parts Commonality and Random Demand ⋮ On the cooperation of recycling operations ⋮ Models and Lagrangian heuristics for a two-level lot-sizing problem with bounded inventory
Cites Work
- Multilevel capacitated lotsizing complexity and LP-based heuristics
- Heuristics for demand-driven disassembly planning
- Heuristics for solving disassemble-to-order problems with stochastic yields
- Remanufacturing planning for the reverse Wagner/Whitin models
- Single item lot sizing problems
- Dynamic Version of the Economic Lot Size Model
- A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints
- A branch and bound algorithm for disassembly scheduling with assembly product structure
- Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case
- An Integrated Model for Job-Shop Planning and Scheduling
- Dynamic Lot Size Models for Multi-Stage Assembly Systems
- Scheduling disassembly
- A two-stage heuristic for disassembly scheduling with assembly product structure
- Disassembly sequencing: A survey
- A concave-cost production planning problem with remanufacturing options
This page was built for publication: Disassembly scheduling: literature review and future research directions