Bi-objective cell loading problem with non-zero setup times with fuzzy aspiration levels in labour intensive manufacturing cells
From MaRDI portal
Publication:5444618
DOI10.1080/00207540601138460zbMath1128.90450OpenAlexW2077513781MaRDI QIDQ5444618
No author found.
Publication date: 25 February 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540601138460
Cites Work
- Applications of fuzzy set theory to mathematical programming
- On the existence of schedules that are near-optimal for both makespan and total weighted completion time
- On the approximate tradeoff for bicriteria batching and parallel machine scheduling problems.
- On two single machine scheduling problems with fuzzy processing times and fuzzy due dates
- A bi-criterion single-machine scheduling problem with learning considerations
- DESCRIPTION AND OPTIMIZATION OF FUZZY SYSTEMS
- A hierarchical model for the cell loading problem of cellular manufacturing systems
- Cell design and loading in the presence of alternative routing
- Evaluation of manufacturing cell loading rules for independent cells
- Minimizing mean squared deviation of completion times with maximum tardiness constraint
This page was built for publication: Bi-objective cell loading problem with non-zero setup times with fuzzy aspiration levels in labour intensive manufacturing cells