Scheduling of unrelated parallel manufacturing cells with limited human resources
From MaRDI portal
Publication:5444619
DOI10.1080/00207540601138452zbMath1128.90352OpenAlexW2079470800MaRDI QIDQ5444619
No author found.
Publication date: 25 February 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540601138452
Related Items (2)
A performance comparison and evaluation of metaheuristics for a batch scheduling problem in a multi-hybrid cell manufacturing system with skilled workforce assignment ⋮ Personnel scheduling and supplies provisioning in emergency relief operations
Cites Work
- Optimization by Simulated Annealing
- A state-of-the-art review of parallel-machine scheduling research
- A local search heuristic for unrelated parallel machine scheduling with efficient neighborhood search
- An analysis of heuristics for the parallel-machine flexible-resource scheduling problem
- A simulation analysis of sequencing rules in a flexible flowline
- Performance of hybrid cellular manufacturing systems: A computer simulation investigation
- Coping with the Loss of Pooling Synergy in Cellular Manufacturing Systems
- Scheduling Parallel Manufacturing Cells with Resource Flexibility
- Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times
- A multi-objective procedure for labour assignments and grouping in capacitated cell formation problems
- Capacity-constrained scheduling for a logic IC final test facility
- Forming effective worker teams for cellular manufacturing
- Worker assignment in cellular manufacturing considering technical and human skills
This page was built for publication: Scheduling of unrelated parallel manufacturing cells with limited human resources