Scheduling in cellular manufacturing systems: an heuristic approach
From MaRDI portal
Publication:5444621
DOI10.1080/00207540601138577zbMath1128.90461OpenAlexW2017786906MaRDI QIDQ5444621
Publication date: 25 February 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540601138577
Related Items
A scatter search approach with dispatching rules for a joint decision of cell formation and parts scheduling in batches ⋮ A comprehensive review of flowshop group scheduling literature ⋮ A performance comparison and evaluation of metaheuristics for a batch scheduling problem in a multi-hybrid cell manufacturing system with skilled workforce assignment
Cites Work
- Unnamed Item
- Optimization by Simulated Annealing
- An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs
- Scheduling a flowline manufacturing cell with sequence dependent family setup times
- An evaluation of group scheduling heuristics in a flow-line manufacturing cell
- Cellular manufacturing at 46 user plants: Implementation experiences and performance improvements
- A hierarchical model for the cell loading problem of cellular manufacturing systems
- A heuristic for scheduling in flowshop and flowline-based manufacturing cell with multi-criteria
- A simulation analyses of factors influencing loading practices in cellular manufacturing
- A multi-constraint neural network for the pragmatic design of cellular manufacturing systems
- A comparison of heuristics for family and job scheduling in a flow-line manufacturing cell
- A comparison of cellular manufacturing research presumptions with practice
- Evaluation of manufacturing cell loading rules for independent cells
- A performance analysis of dispatching rules and a heuristic in static flowshops with missing operations of jobs