Simulation-based performance comparison between dynamic cells, classical cells and job shops: a case study
From MaRDI portal
Publication:5444626
DOI10.1080/00207540601138312zbMath1128.90363OpenAlexW1997309606MaRDI QIDQ5444626
Georges Abdulnour, Jocelyn Drolet, Yves Marcoux
Publication date: 25 February 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540601138312
simulationschedulejob shopinteractionfactorsmodelexperimental designpriority rulesSMEJITSMEDclassical cellDCMSdynamic cellexperimental planvirtual cell
Related Items (3)
A genetic algorithm based heuristic for scheduling of virtual manufacturing cells (VMCs) ⋮ Analyzing the behaviors of virtual cells (VCs) and traditional manufacturing systems: Ant colony optimization (ACO)-based metamodels ⋮ A SIMULATED ANNEALING FOR INTRA-CELL LAYOUT DESIGN OF DYNAMIC CELLULAR MANUFACTURING SYSTEMS WITH ROUTE SELECTION, PURCHASING MACHINES AND CELL RECONFIGURATION
Uses Software
Cites Work
This page was built for publication: Simulation-based performance comparison between dynamic cells, classical cells and job shops: a case study