Due-date assignment and parallel-machine scheduling with deteriorating jobs
From MaRDI portal
Publication:5447776
DOI10.1057/PALGRAVE.JORS.2602225zbMath1278.90145OpenAlexW2010898528MaRDI QIDQ5447776
No author found.
Publication date: 20 March 2008
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2602225
Related Items (7)
Due date assignment and single machine scheduling with deteriorating jobs to minimize the weighted number of tardy jobs ⋮ Approaches to Solving Scheduling with Due-Window Assignment and Deterioration Effects ⋮ Minimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deterioration ⋮ Scheduling with due date assignment under special conditions on job processing ⋮ Four single-machine scheduling problems involving due date determination decisions ⋮ Parallel identical machines scheduling with deteriorating jobs and total absolute differences penalties ⋮ Single machine group scheduling with time dependent processing times and ready times
This page was built for publication: Due-date assignment and parallel-machine scheduling with deteriorating jobs