Minimum Average Fraction Inspected for Combined Continuous Lot by Lot Acceptance Sampling Plan
From MaRDI portal
Publication:5454861
DOI10.1515/EQC.2004.115zbMath1132.62368OpenAlexW1974942167MaRDI QIDQ5454861
Publication date: 3 April 2008
Published in: Economic Quality Control (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1515/eqc.2004.115
average outgoing quality (AOQ)continuous sampling planaverage outgoing quality limit (AOQL)average fraction inspected (AFI)lot by lot inspection plan
Cites Work
This page was built for publication: Minimum Average Fraction Inspected for Combined Continuous Lot by Lot Acceptance Sampling Plan