A penalty-based heuristic algorithm for the permutation flowshop scheduling problem with sequence-dependent set-up times
From MaRDI portal
Publication:5477730
DOI10.1057/palgrave.jors.2602020zbMath1113.90172OpenAlexW2047157537MaRDI QIDQ5477730
Jatinder N. D. Gupta, Edward F. jun. Stafford, F. T. Tseng
Publication date: 6 July 2006
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2602020
flowshop schedulingcomputational comparisonsminimizing makespansequence-dependent set-up timespenalty-based and savings index heuristic algorithms
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)