A DBR scheduling method for manufacturing environments with bottleneck re-entrant flows
From MaRDI portal
Publication:5478836
DOI10.1080/00207540500362187zbMath1095.90538OpenAlexW2084167856MaRDI QIDQ5478836
No author found.
Publication date: 13 July 2006
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540500362187
Bottleneck re-entrant flowsBottleneck schedulingDBR (drum-buffer-rope)Drum development methodTOC (theory of constraints)
Related Items (1)
Cites Work
This page was built for publication: A DBR scheduling method for manufacturing environments with bottleneck re-entrant flows