Minimizing the Makespan and Flowtime in Two-Machine Stochastic Open Shops
From MaRDI portal
Publication:5485388
DOI10.1017/S0269964800004563zbMath1093.90531OpenAlexW2039064745MaRDI QIDQ5485388
Georgia-Ann Klutke, Tian-Shyug Lee
Publication date: 30 August 2006
Published in: Probability in the Engineering and Informational Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1017/s0269964800004563
Cites Work
- Unnamed Item
- On the optimality of static policy in stochastic open shop
- Open shop scheduling with machine dependent processing times
- Optimal two- and three-stage production schedules with setup times included
- Stochastically minimizing the makespan in flow shops
- A note on the two machine job shop with exponential processing times
- On Johnson's Two-Machine Flow Shop with Random Processing Times
- Minimizing the Expected Makespan in Stochastic Flow Shops
- Minimizing expected makespan in stochastic open shops
- Open Shop Scheduling to Minimize Finish Time
This page was built for publication: Minimizing the Makespan and Flowtime in Two-Machine Stochastic Open Shops