Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
scientific article; zbMATH DE number 5050659 - MaRDI portal

scientific article; zbMATH DE number 5050659

From MaRDI portal
Publication:5485395

zbMath1094.90561MaRDI QIDQ5485395

Xiuli Chao, Michael L. Pinedo

Publication date: 30 August 2006


Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.



Related Items (27)

Check-in computation and optimization by simulation and IP in combinationA multi-criteria approach for scheduling semiconductor wafer fabrication facilitiesFlow-shop scheduling for three serial stations with the last two duplicateUsing two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applicationsMetaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due dateOn the interaction between maintenance, spare part inventories and repair capacity for a \(k\)-out-of-\(N\) system with wear-outAn effective architecture for learning and evolving flexible job-shop schedulesSolving a concrete sleepers production scheduling by genetic algorithmsOn the complexity of adjacent resource schedulingA note on the two machine job shop with the weighted late work criterionTwo-machine flow shop total tardiness scheduling problem with deteriorating jobsUnnamed ItemOpen shop scheduling problems with late work criteria.A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approachA Lagrangean relaxation approach for the mixed-model flow line sequencing problemMulticriteria optimisation and simulation: an industrial applicationA comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteriaSkilled workforce scheduling in service centresA new neighborhood and tabu search for the blocking job shopMinimizing makespan subject to minimum flowtime on two identical parallel machinesThe two-machine flow-shop problem with weighted late work criterion and common due dateTwo-machine open shop scheduling with secondary criteriaA Petri net based algorithm for minimizing total tardiness in flexible manufacturing systemsMIP-based decomposition strategies for large-scale scheduling problems in multiproduct multistage batch plants: a benchmark scheduling problem of the pharmaceutical industryUsing a hybrid evolutionary algorithm to minimize variance in response time for multimedia object requestsList scheduling in a parallel machine environment with precedence constraints and setup timesUsing MLP networks to design a production scheduling system




This page was built for publication: