Two‐machine flowshop scheduling with conditional deteriorating second operations
From MaRDI portal
Publication:5488249
DOI10.1111/j.1475-3995.2006.00536.xzbMath1127.90031OpenAlexW1990565883MaRDI QIDQ5488249
Cheng, T. C. Edwin, Bertrand M. T. Lin
Publication date: 14 September 2006
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/10397/645
Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35)
Related Items (6)
Relocation scheduling subject to fixed processing sequences ⋮ Permutation flowshop manufacturing cell scheduling problems with deteriorating jobs and sequence dependent setup times under dominant machines ⋮ Total completion time minimization in a \(2\)-stage differentiation flowshop with fixed sequences per job type ⋮ Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence ⋮ Scheduling with centralized and decentralized batching policies in concurrent open shops ⋮ The Browne-Yechiali single-machine sequence is optimal for flow-shops
Cites Work
This page was built for publication: Two‐machine flowshop scheduling with conditional deteriorating second operations