Optimal Scheduling on Parallel Processors with Precedence Constraints and General Costs
From MaRDI portal
Publication:5488537
DOI10.1017/S0269964800004691zbMath1096.68568MaRDI QIDQ5488537
Publication date: 22 September 2006
Published in: Probability in the Engineering and Informational Sciences (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items
Cites Work
- Scheduling Jobs with Exponentially Distributed Processing Times and Intree Precedence Constraints on Two Parallel Machines
- Scheduling Interval-Ordered Tasks
- On the Optimal Stochastic Scheduling of Out-Forests
- Optimal Scheduling of Exponential Tasks with In-Tree Precedence Constraints on Two Parallel Processors Subject to Failure and Repair
- Stochastic Scheduling with Variable Profile and Precedence Constraints
- On Stochastic Scheduling with In-Tree Precedence Constraints
- A Stochastic Scheduling Problem with Intree Precedence Constraints