A single-machine group schedule with fuzzy setup and processing times
From MaRDI portal
Publication:5490152
DOI10.1080/02522667.2005.10699671zbMath1098.90036OpenAlexW2054359989MaRDI QIDQ5490152
Publication date: 4 October 2006
Published in: Journal of Information and Optimization Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/02522667.2005.10699671
Cites Work
- Unnamed Item
- Ranking fuzzy numbers with integral value.
- Job sequencing with fuzzy processing times
- A review of some methods for ranking fuzzy subsets
- Comparison of fuzzy numbers based on the probability measure of fuzzy events
- Two scheduling problems with fuzzy due-dates
- Economic production quantity for fuzzy demand quantity and fuzzy production quantity
- One machine scheduling problem with fuzzy duedates
- Single Machine Group Scheduling with Two Ordered Criteria
- Scheduling Groups of Jobs on a Single Machine
This page was built for publication: A single-machine group schedule with fuzzy setup and processing times