A hybrid flowshop scheduling model considering dedicated machines and lot-splitting for the solar cell industry
From MaRDI portal
Publication:5499811
DOI10.1080/00207721.2012.762557zbMath1317.90109OpenAlexW2031997983MaRDI QIDQ5499811
Tzu-Li Chen, Chen-Yang Cheng, Yin-Yann Chen, Chin-Wei Chang, Li-Chih Wang
Publication date: 31 July 2015
Published in: International Journal of Systems Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207721.2012.762557
Cites Work
This page was built for publication: A hybrid flowshop scheduling model considering dedicated machines and lot-splitting for the solar cell industry