On the Expected Duration of PERT Type Networks
From MaRDI portal
Publication:5541753
DOI10.1287/mnsc.13.5.299zbMath0158.38303OpenAlexW2093510796MaRDI QIDQ5541753
Publication date: 1967
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.13.5.299
Related Items
Approximating the distribution functions in stochastic networks, Risk taking in stochastic PERT networks, A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept, Longest path analysis in networks of queues: dynamic scheduling problems, An optimization model for stochastic project networks with cash flows, Evolutionary algorithms for multi-objective stochastic resource availability cost problem, A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network, Lower bound for the mean project completion time in dynamic PERT networks, A heuristic procedure for solving the dynamic probabilistic project expediting problem, Time-cost trade-off via optimal control theory in Markov PERT networks, Fuzzy project scheduling problem and its hybrid intelligent algorithm, A multi-objective resource allocation problem in PERT networks, Stochastic networks and the extreme value distribution, A review of the contribution of operational research to project management, Resource-constrained project scheduling: Notation, classification, models, and methods, An approximate solution to the PERT problem, Unnamed Item, Stochastic and fuzzy PERT, Project scheduling problem with stochastic activity duration times, Improving project cost estimation by taking into account managerial flexibility, An upper bound on the expected completion time of PERT networks, A new structural mechanism for reducibility of stochastic PERT networks