Shortest Route Models for the Allocation of Inspection Effort on a Production Line
From MaRDI portal
Publication:5556927
DOI10.1287/mnsc.15.5.249zbMath0169.51701OpenAlexW2103020051MaRDI QIDQ5556927
Publication date: 1969
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/1721.1/49188
Related Items (14)
Workflow analysis of production lines with complete inspection and rework loops ⋮ Dynamically determined optimal inspection strategies for serial production processes ⋮ An efficient algorithm for maximizing the expected profit from a serial production line with inspection stations and rework ⋮ Inspector location in convergent production lines ⋮ An evolutionary algorithm and discrete event simulation for optimizing inspection strategies for multi-stage processes ⋮ Optimal inspection effort and scheduling for a manufacturing process with repair ⋮ Specialized inspection problems in serial production systems ⋮ Quality control in a single state production system: open and closed loop policies ⋮ Optimal inspection policies in a serial production system including scrap rework and repair: An MILP approach ⋮ Minimum time paths in a network with mixed time constraints. ⋮ A particle swarm algorithm for inspection optimization in serial multi-stage processes ⋮ Layer modelling for the inspection allocation problem in re-entrant production systems ⋮ Quality control and product servicing: A decision framework ⋮ Designing an optimal production system with inspection
This page was built for publication: Shortest Route Models for the Allocation of Inspection Effort on a Production Line