Optimum Time Compression in Project Scheduling
From MaRDI portal
Publication:5590540
DOI10.1287/mnsc.16.10.B597zbMath0194.50701OpenAlexW2064141563MaRDI QIDQ5590540
Leonard R. Lamberson, R. R. Hocking
Publication date: 1970
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.16.10.b597
Related Items
The discrete time/cost trade-off problem: Extensions and heuristic procedures, A float-path theory and its application to the time-cost tradeoff problem, A continuous time-cost tradeoff problem with multiple milestones and completely ordered jobs, Resource allocation in multi-class dynamic PERT networks with finite capacity, An adaptive crashing policy for stochastic time-cost tradeoff problems, Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach, Simplifying the nonlinear continuous time-cost tradeoff problem, A multi-objective resource allocation problem in dynamic PERT networks, A heuristic procedure for solving the dynamic probabilistic project expediting problem, Time-cost trade-off via optimal control theory in Markov PERT networks, The risk element transmission theory research of multi-objective risk-time-cost trade-off, A multi-objective resource allocation problem in PERT networks, New computational results for the discrete time/cost trade-off problem with time-switch constraints, The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure, A genetic algorithm approach for the time-cost trade-off in PERT networks, A Time–Cost Tradeoff Problem with Multiple Assessments and Release Times on a Chain Precedence Graph