A note on a paper by W. Szwarc
From MaRDI portal
Publication:5621267
DOI10.1002/nav.3800180114zbMath0217.27301OpenAlexW2122099800MaRDI QIDQ5621267
No author found.
Publication date: 1971
Published in: Naval Research Logistics Quarterly (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.3800180114
Integer programming (90C10) Deterministic scheduling theory in operations research (90B35) Theory of organizations, manpower planning in operations research (90B70)
Related Items
Two- and three-machine flow shop scheduling problems with equal sized transfer batches ⋮ Non-bottleneck machines in three-machine flow shops
Cites Work