Technical Note—An Improved Combinatorial Algorithm for the Flowshop-Scheduling Problem
From MaRDI portal
Publication:5635251
DOI10.1287/opre.19.7.1753zbMath0227.90030OpenAlexW2055285724MaRDI QIDQ5635251
Publication date: 1971
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.19.7.1753
Related Items (5)
Minimizing makespan in a two-machine flowshop scheduling with batching and release time ⋮ Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times ⋮ Flow-shops with a dominant machine ⋮ Generating improved dominance conditions for the flowshop problem ⋮ Flowshop scheduling research after five decades
This page was built for publication: Technical Note—An Improved Combinatorial Algorithm for the Flowshop-Scheduling Problem