Critical Path Problems with Concave Cost-Time Curves
From MaRDI portal
Publication:5661341
DOI10.1287/mnsc.19.4.446zbMath0248.90057OpenAlexW2131396038MaRDI QIDQ5661341
Joel L. Horowitz, James E. Falk
Publication date: 1972
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.19.4.446
Programming involving graphs or networks (90C35) Deterministic network models in operations research (90B10)
Related Items (32)
Resource allocation via dynamic programming in activity networks ⋮ The discrete time/cost trade-off problem: Extensions and heuristic procedures ⋮ A float-path theory and its application to the time-cost tradeoff problem ⋮ A continuous time-cost tradeoff problem with multiple milestones and completely ordered jobs ⋮ Resource allocation in multi-class dynamic PERT networks with finite capacity ⋮ A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search ⋮ Concavely-Priced Probabilistic Timed Automata ⋮ Multimode time-cost-robustness trade-off project scheduling problem under uncertainty ⋮ Improving electromagnetism algorithm for solving resource allocation problem in stochastic networks ⋮ An adaptive crashing policy for stochastic time-cost tradeoff problems ⋮ Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach ⋮ An intelligent interactive project management support system ⋮ Single-machine scheduling of multiple projects with controllable processing times ⋮ Simplifying the nonlinear continuous time-cost tradeoff problem ⋮ Longitudinal cooperative robust optimization model for sustainable supply chain management ⋮ Scheduling two projects with controllable processing times in a single-machine environment ⋮ A multi-objective resource allocation problem in dynamic PERT networks ⋮ Time-cost trade-off via optimal control theory in Markov PERT networks ⋮ The risk element transmission theory research of multi-objective risk-time-cost trade-off ⋮ A multi-objective resource allocation problem in PERT networks ⋮ Unnamed Item ⋮ Experimental evaluation of simulated annealing algorithms for the time-cost trade-off problem ⋮ New computational results for the discrete time/cost trade-off problem with time-switch constraints ⋮ Using schedule risk analysis with resource constraints for project control ⋮ A new approach based on the surrogating method in the project time compression problems ⋮ Bounding a class of nonconvex linearly-constrained resource allocation problems via the surrogate dual ⋮ Project management with time, cost, and quality considerations ⋮ The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure ⋮ A network flow procedure for project crashing with penalty nodes ⋮ A genetic algorithm approach for the time-cost trade-off in PERT networks ⋮ Improving project cost estimation by taking into account managerial flexibility ⋮ A Time–Cost Tradeoff Problem with Multiple Assessments and Release Times on a Chain Precedence Graph
This page was built for publication: Critical Path Problems with Concave Cost-Time Curves