Minimizing Resource Availability Costs in Time-Limited Project Networks

From MaRDI portal
Publication:5689376

DOI10.1287/mnsc.41.10.1590zbMath0861.90071OpenAlexW2066960045MaRDI QIDQ5689376

Erik L. Demeulemeester

Publication date: 6 January 1997

Published in: Management Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/mnsc.41.10.1590




Related Items (37)

Mixed integer programming formulations for the biomass truck scheduling problemA metaheuristic solution approach for the time-constrained project scheduling problemAn exact algorithm for an integrated project staffing problem with a homogeneous workforceTime-constrained project schedulingMulti-mode resource constrained multi-project scheduling and resource portfolio problemMulti-mode resource availability cost problem with recruitment and release dates for resourcesA genetic algorithm for resource investment problem with discounted cash flowsEvolutionary algorithms for multi-objective stochastic resource availability cost problemA capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methodsA genetic algorithm for resource investment project scheduling problem, tardiness permitted with penaltyRobust optimization models for project scheduling with resource availability costSolving project scheduling problem with the philosophy of fuzzy random programmingRobust decision trees for the multi-mode project scheduling problem with a resource investment objective and uncertain activity durationOrder-based neighborhoods for project scheduling with nonregular objective functions.The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper boundsMultimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedureA cost optimization model for multiresource leveling problem without project duration constraintSCHEDULING THE HARVESTING OPERATIONS OF A FOREST BLOCK: A CASE STUDYThe bilevel optimisation of a multi-agent project scheduling and staffing problemAn effective heuristic for project scheduling with resource availability costMixed-integer linear programming and constraint programming formulations for solving resource availability cost problemsSolving the resource availability cost problem in project scheduling by path relinking and genetic algorithmFuzzy project scheduling problem and its hybrid intelligent algorithmA hybrid framework for over-constrained generalized resource-constrained project scheduling problemsAn exact algorithm for minimizing resource availability costs in project schedulingAn efficient genetic algorithm to maximize net present value of project payments under inflation and bonus-penalty policy in resource investment problemUm algoritmo exato para o problema de programação de projetos com custo de disponibilidade de recursos e múltiplos modosResource-constrained project scheduling: Notation, classification, models, and methodsResource levelling for projects with schedule-dependent time windowsA MULTI-OBJECTIVE RISK-BASED FRAMEWORK FOR MISSION CAPABILITY PLANNINGA parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relationsA priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penaltiesPolyhedral Results and Branch-and-Cut for the Resource Loading ProblemHeuristics for multimode scheduling problems with dedicated resourcesScatter search for project scheduling with resource availability costProject scheduling problem with stochastic activity duration timesProcedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints




This page was built for publication: Minimizing Resource Availability Costs in Time-Limited Project Networks