Sequencing with setup time and order tardiness trade-offs

From MaRDI portal
Publication:5689648
Jump to:navigation, search

DOI<link itemprop=identifier href="https://doi.org/10.1002/(SICI)1520-6750(199610)43:7<971::AID-NAV3>3.0.CO;2-A" /><971::AID-NAV3>3.0.CO;2-A 10.1002/(SICI)1520-6750(199610)43:7<971::AID-NAV3>3.0.CO;2-AzbMath0868.90067OpenAlexW2000884674MaRDI QIDQ5689648

Cheng-Hsing Chuang, Ching-Jong Liao

Publication date: 7 January 1997

Full work available at URL: https://doi.org/10.1002/(sici)1520-6750(199610)43:7<971::aid-nav3>3.0.co;2-a


zbMATH Keywords

branch-and-boundsetup timesingle facilitynumber of tardy orders


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items (5)

Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures ⋮ Customer order scheduling on a single machine with family setup times: complexity and algorithms ⋮ Bicriteria scheduling with vacations on a single machine ⋮ Sequencing heuristic for bicriteria scheduling in a single machine problem ⋮ Single machine scheduling to minimize the setup time and the earliness







This page was built for publication: Sequencing with setup time and order tardiness trade-offs

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:5689648&oldid=30402831"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 7 March 2024, at 04:33.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki