A SIMPLE LOWER BOUND FOR TOTAL COMPLETION TIME MINIMIZATION IN A TWO-MACHINE FLOWSHOP
From MaRDI portal
Publication:5708850
DOI10.1142/S0217595905000601zbMath1088.90027OpenAlexW2163526210MaRDI QIDQ5708850
No author found.
Publication date: 21 November 2005
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s0217595905000601
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (2)
Flow shop non-idle scheduling and resource-constrained scheduling ⋮ Minimizing Total Idle Energy Consumption in the Permutation Flow Shop Scheduling Problem
Cites Work
- Unnamed Item
- Unnamed Item
- Improved lower bounds for minimizing the sum of completion times of n jobs over m machines in a flow shop
- The two-machine total completion time flow shop problem
- A heuristic algorithm for mean flowtime objective in flowshop scheduling
- An improved branch-and-bound algorithm for the two machine total completion time flow shop problem
- Minimizing Total Completion Time in a Two-Machine Flowshop: Analysis of Special Cases
- Optimal two- and three-stage production schedules with setup times included
- The Lagrangian Relaxation Method for Solving Integer Programming Problems
- The Lessons of Flowshop Scheduling Research
- Minimizing Mean Flow Time in Two-Machine Open Shops and Flow Shops
- Exact, Approximate, and Guaranteed Accuracy Algorithms for the Flow-Shop Problem n / 2 / F / F¯
- Flowshop and Jobshop Schedules: Complexity and Approximation
- The Complexity of Flowshop and Jobshop Scheduling
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
This page was built for publication: A SIMPLE LOWER BOUND FOR TOTAL COMPLETION TIME MINIMIZATION IN A TWO-MACHINE FLOWSHOP