Simulation of stochastic activity networks using path control variates
DOI<link itemprop=identifier href="https://doi.org/10.1002/1520-6750(199104)38:2<183::AID-NAV3220380206>3.0.CO;2-V" /><183::AID-NAV3220380206>3.0.CO;2-V 10.1002/1520-6750(199104)38:2<183::AID-NAV3220380206>3.0.CO;2-VzbMath0717.90027OpenAlexW1994023837MaRDI QIDQ5749139
Athanassios N. Avramidis, James R. Wilson, Kenneth W. jun. Bauer
Publication date: 1991
Full work available at URL: https://doi.org/10.1002/1520-6750(199104)38:2<183::aid-nav3220380206>3.0.co;2-v
stochastic activity networksmean completion timeestimation proceduresconfidence-interval estimatorscontrolled point estimators
Probabilistic models, generic numerical methods in probability and statistics (65C20) Stochastic network models in operations research (90B15) Deterministic scheduling theory in operations research (90B35)
Related Items (4)
Cites Work
This page was built for publication: Simulation of stochastic activity networks using path control variates