A Theoretical Framework for Instance Complexity of the Resource-Constrained Project Scheduling Problem
From MaRDI portal
Publication:5870371
DOI10.1287/moor.2021.1237OpenAlexW4206913842MaRDI QIDQ5870371
Mario Vanhoucke, Rob Van Eynde
Publication date: 9 January 2023
Published in: Mathematics of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/moor.2021.1237
Combinatorics of partially ordered sets (06A07) Deterministic scheduling theory in operations research (90B35) Enumeration in graph theory (05C30)
Related Items (3)
A reduction tree approach for the discrete time/cost trade-off problem ⋮ Optimal \((0, 1)\)-matrix completion with majorization ordered objectives ⋮ Continuous-time formulations for multi-mode project scheduling
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- A survey of the algorithmic aspects of modular decomposition
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Counting linear extensions
- On the use of the complexity index as a measure of complexity in activity networks
- PSPLIB -- a project scheduling problem library
- Resource-constrained project scheduling: A survey of recent developments.
- An exact composite lower bound strategy for the resource-constrained project scheduling problem
- A simple linear time algorithm for cograph recognition
- On the generation of circuits and minimal forbidden sets
- Resource-constrained project scheduling: Notation, classification, models, and methods
- An evaluation of the adequacy of project network generators with systematically sampled networks
- Going to the core of hard resource-constrained project scheduling instances
- Scheduling Resource-Constrained Projects Competitively at Modest Memory Requirements
- Phase transitions in project scheduling
- Optimal Sequencing by Modular Decomposition: Polynomial Algorithms
- Optimal Sequencing Via Modular Decomposition: Characterization of Sequencing Functions
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Measures of the restrictiveness of project networks
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
This page was built for publication: A Theoretical Framework for Instance Complexity of the Resource-Constrained Project Scheduling Problem