Optimal preventive replacement last policy for a successive random works system with random lead time
From MaRDI portal
Publication:5875318
DOI10.1080/03610926.2021.1926506OpenAlexW3160261701MaRDI QIDQ5875318
Publication date: 3 February 2023
Published in: Communications in Statistics - Theory and Methods (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03610926.2021.1926506
Related Items (1)
Cites Work
- Unnamed Item
- Imperfect maintenance
- A survey of maintenance policies of deteriorating systems
- Optimal age-replacement policy of a system subject to shocks with random lead-time
- Optimization problems of replacement first or last in reliability theory
- Periodic replacement policies with shortage and excess costs
- Preventive replacement policies for parallel systems with deviation costs between replacement and failure
- Optimum random and age replacement policies for customer-demand multi-state system reliability under imperfect maintenance
- Optimal preventive policies for imperfect maintenance models with replacement first and last
- Imperfect repair
- Optimum Preventive Maintenance Policies
- Age-dependent minimal repair
- The Optimum Repair Limit Replacement Policies
- Optimization of continuous and discrete scheduled times for a cumulative damage system with age-dependent maintenance
- Preventive replacement policies with products update announcements
- Optimal scheduling replacement policies for a system with multiple random works
- Optimum sequential preventive maintenance first or last policies with imperfect maintenance for a system subject to shocks
This page was built for publication: Optimal preventive replacement last policy for a successive random works system with random lead time