Minimisation Du Coût De Disponibilité Des Ressources D’un Projet Sous Contrainte De Temps Par Une Adaptation De La Méthode Tabou
From MaRDI portal
Publication:5888260
DOI10.1080/03155986.2002.11732658OpenAlexW2401679380MaRDI QIDQ5888260
Gilles R. D'Avignon, Fayez F. Boctor, Michel Gagnon
Publication date: 24 April 2023
Published in: INFOR: Information Systems and Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03155986.2002.11732658
Related Items (1)
This page was built for publication: Minimisation Du Coût De Disponibilité Des Ressources D’un Projet Sous Contrainte De Temps Par Une Adaptation De La Méthode Tabou