Minimizing mean squared deviation of completion times with maximum tardiness constraint
From MaRDI portal
Publication:5925939
DOI10.1016/S0377-2217(99)00425-7zbMath0990.90047OpenAlexW2068881648MaRDI QIDQ5925939
No author found.
Publication date: 12 March 2001
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(99)00425-7
Related Items (1)
Cites Work
- Single machine scheduling to minimize weighted earliness subject to no tardy jobs
- Solving a bicriterion scheduling problem
- Minimizing the average deviation of job completion times about a common due date
- Sequencing with Earliness and Tardiness Penalties: A Review
- Minimizing Mean Squared Deviation of Completion Times About a Common Due Date
- Minimizing Variation of Flow Time in Single Machine Systems
- Minimising Waiting Time Variance in the Single Machine Problem
- Optimal Single-Machine Scheduling with Earliness and Tardiness Penalties
- Deterministic and Random Single Machine Sequencing with Variance Minimization
- Note—A Note on the Minimization of Mean Squared Deviation of Completion Times About a Common Due Date
- Variance Minimization in Single Machine Sequencing Problems
This page was built for publication: Minimizing mean squared deviation of completion times with maximum tardiness constraint