Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Analysis of reactive scheduling problems in a job shop environment - MaRDI portal

Analysis of reactive scheduling problems in a job shop environment

From MaRDI portal
Publication:5928448

DOI10.1016/S0377-2217(99)00311-2zbMath0976.90045OpenAlexW2143768863MaRDI QIDQ5928448

Ịhsan Sabuncuoğlu, M. Bayız

Publication date: 28 March 2001

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0377-2217(99)00311-2




Related Items (23)

A robust approach for the single machine scheduling problemExecuting production schedules in the face of uncertainties: a review and some future directionsDispatching strategies for managing uncertainties in automated manufacturing systemsA holonic approach to flexible flow shop scheduling under stochastic processing timesRisk measure of job shop scheduling with random machine breakdownsPredictive-reactive scheduling for single surgical suite subject to random emergency surgeryMinimizing conditional-value-at-risk for stochastic scheduling problemsScheduling wagons to unload in bulk cargo ports with uncertain processing timesBacktracking and exchange of information: Methods to enhance a beam search algorithm for assembly line schedulingStrategies for dispatching AGVs at automated seaport container terminalsNew expression of scheduling performance measuresScheduling jobs with normally distributed processing times on parallel machinesA real-time methodology for minimizing mean flowtime in FMSs with machine breakdowns: threshold-based selective reroutingProject scheduling under uncertainty: survey and research potentialsA theoretic and practical framework for scheduling in a stochastic environmentA survey of dynamic scheduling in manufacturing systemsAn immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdownsPerformance of an ant colony optimisation algorithm in dynamic job shop scheduling problemsProactive and reactive strategies for football league timetablingExtension of Rescheduling Based on Minimal Graph CutStochastic assembly line balancing using beam searchModeling and Managing Uncertainty in Process Planning and SchedulingDynamic flexibility metrics for capability and capacity



Cites Work


This page was built for publication: Analysis of reactive scheduling problems in a job shop environment