Part sequencing in three-machine no-wait robotic cells
From MaRDI portal
Publication:5929148
DOI10.1016/S0167-6377(00)00046-8zbMath1096.90542MaRDI QIDQ5929148
Dario Pacciarelli, Alessandro Agnetis
Publication date: 2000
Published in: Operations Research Letters (Search for Journal in Brave)
Programming involving graphs or networks (90C35) Abstract computational complexity for mathematical programming problems (90C60)
Related Items
Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times ⋮ A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots ⋮ Sequencing and scheduling in robotic cells: recent developments ⋮ A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell ⋮ Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints ⋮ A survey of scheduling problems with no-wait in process ⋮ Approximation algorithms for \(k\)-unit cyclic solutions in robotic cells ⋮ A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line ⋮ An optimization-based heuristic for the robotic cell problem ⋮ Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots ⋮ A review of TSP based approaches for flowshop scheduling
Cites Work
- Unnamed Item
- An improved algorithm for cyclic flowshop scheduling in a robotic cell
- A strongly polynomial algorithm for no-wait cyclic robotic flowshop scheduling
- Scheduling no-wait robotic cells with two and three machines
- The Three-Machine No-Wait Flow Shop is NP-Complete
- Scheduling in Robotic Cells: Classification, Two and Three Machine Cells
- Cyclic Scheduling of Identical Parts in a Robotic Cell
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem