Scheduling in a two-machine flowshop with batch processing machine(s) for earliness/tardiness measure under a common due date
From MaRDI portal
Publication:5937351
DOI10.1016/S0377-2217(99)00447-6zbMath0979.90029MaRDI QIDQ5937351
Publication date: 12 July 2001
Published in: European Journal of Operational Research (Search for Journal in Brave)
Related Items
Flow shop scheduling with earliness, tardiness, and intermediate inventory holding costs, Two-machine flow shop scheduling with two criteria: maximum earliness and makespan, Earliness tardiness production planning and scheduling in flexible flowshop systems under finite planning horizon, Decomposition heuristics for minimizing earliness-tardiness on parallel burn-in ovens with a common due date, Integrated scheduling on a batch machine to minimize production, inventory and distribution costs, Scheduling in a two-machine flowshop for the minimization of the mean absolute deviation from a common due date, Scheduling with common due date, earliness and tardiness penalties for multimachine problems: a survey, A note on a due-date assignment on a two-machine flow-shop, Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed, Minimizing total earliness and tardiness for common due date single-machine scheduling with an unavailability interval, Heuristic and exact algorithms for the two-machine just in time job shop scheduling problem, Flowshop-scheduling problems with makespan criterion: a review, A survey of scheduling with parallel batch (p-batch) processing, A filtered beam search method for the \(m\)-machine permutation flowshop scheduling problem minimizing the earliness and tardiness penalties and the waiting time of the jobs, Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach
Cites Work
- Efficient scheduling algorithms for a single batch processing machine
- A single machine scheduling problem with earliness/tardiness and starting time penalties under a common due date
- A note on minimizing the weighted sum of tardy and early completion penalties in a single machine: A case of small common due date
- An improved dynamic programming algorithm for the single-machine mean absolute deviation problem with a restrictive common due date
- A note on one-processor scheduling with asymmetric earliness and tardiness penalties
- Minimizing the sum of absolute lateness in single-machine and multimachine scheduling
- Minimizing the average deviation of job completion times about a common due date
- Sequencing with Earliness and Tardiness Penalties: A Review
- Minimizing mean absolute deviation of completion times about a common due date
- Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date
- Earliness–Tardiness Scheduling Problems, II: Deviation of Completion Times About a Restrictive Common Due Date
- Batching and Scheduling Jobs on Batch and Discrete Processors
- Scheduling job families about an unrestricted common due date on a single machine
- Parallel-Machine Scheduling Problems with Earliness and Tardiness Penalties
- Scheduling Groups of Jobs on a Single Machine